The granite mobile crusher was finally chosen after careful comparisons. Since operation, it has been high-yield and stable, attracting many customers nearby.
Materials are fed to the large bin of the granite mobile crusher through the excavator or forklift. The feeder under the bin evenly feeds materials into the C6X Jaw Crusher for crushing. The materials after crushing will be screened by the vibrating screen first, and some finished products will be screened. The rest of large materials will be sent to the HST Single Cylinder Hydraulic Cone Crusher. After being crushed, materials will be sent to the main belt conveyor on which three specifications of finished products will be screened. The screen mesh can be set according to the specific needs of customers.
K3YC-100T Mobile Crusher, GF feeder, C6X Jaw Crusher, HST Single Cylinder Hydraulic Cone Crusher, S5X Vibrating Screen
The process design of the plant of the granite mobile crusher is reasonable and simple, which greatly reduces the number of belt conveyor and hopper, shortens the equipment installation cycle (the whole plant only takes about 10 days to install and commission production), reduces the failure rate, the energy consumption and the production cost.
The main machine of the plant adopts the most advanced C6X Jaw Crusher and HST Cone Crusher. C6X Jaw Crusher adjusts discharge port of hydraulic technology, which is convenient and fast, and HST Cone Crusher adjusts of full hydraulic technology and LCD operation. Thus lamination breaking makes excellent particle type.
When producing 100 tons of hard rock, one station can do it, which is more economical than the previous two stations, greatly reducing the number of external belt conveyor, and more convenient to move.
The construction period of the granite mobile crusher is short, and it is convenient to move. The plant of the granite mobile crusher does not need to be used as the concrete foundation, or as many bins and hoppers. The sand and stone plant is more rapid, better and more economical. It is suitable for the temporary stock yard of each high-speed railway, the plan project of each real estate field and the processing project of the materials from the mixing station!